CFPP 01-01 Part D: SIWD Test Schedule

CFPP 01-01 Part D: Surgical Instrument Washer Disinfector
Installation, Commissioning and Periodic Test Schedule.

Below is the CFPP 01-01 installation, commissioning and periodic test schedule for surgical instrument washer disinfectors.

Manufacturer schedules take precedent over the schedule from CFPP 01-01 Part D. If no information is available from the manufacturer then the schedule below should be followed.

Type Tests and Works Tests are carried out by the Manufacturer.

Installation and commissioning (IQ OQ PQ) is carried out by either the equipment Supplier or a qualified Competent Person (Decontamination).

Periodic testing is carried out routinely by the User (or by delegation to the Operator), and also a qualified Competent Person (Decontamination).

Testing Categories

Tests, References and Schedules

A key to the various abbreviations used can be found at the bottom of this page.

Housekeeping and Safety Checks

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part D
Remove & Clean Filters & Strainers Etc. Section 2
Table 3
             
CFPP
01-01
Part D
Weekly Safety Checks 2.66        
CFPP
01-01
Part D
Yearly Safety Checks 2.68                
Back to Testing Categories | Table Key
Cleaning Efficacy

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part D
Visual Inspection 2.34
2.287
         
CFPP
01-01
Part D
Cleaning Efficacy by Residual Soil 2.268            
CFPP
01-01
Part D
Cleaning Efficacy Test: Chamber Walls & Load Carriers 1 2.242        
CFPP
01-01
Part D
Cleaning Efficacy Test: Reference Load 1 2.247        
1: Cleaning efficacy test on Reference Load is performed directly after a successful cleaning efficacy test on Walls and Load Carriers - Ref: 2.247
 Back to Testing Categories | Table Key
Automatic Control Test
& Verification of Calibration
Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part D
Automatic Control Test 1 2.304      
CFPP
01-01
Part D
Verification of Calibration 1 2.181    
1: These tests can be performed at the same time - Ref: Section 2.182
Back to Testing Categories | Table Key
Chemical Additives,
Reproducibility & Residues
Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part D
Chemical Dosing: Reproducibility of Volume Admitted
 2.159        
CFPP
01-01
Part D
Indication of insufficient chemical additives 1 2.168        
CFPP
01-01
Part D
Residual Chemical Additives 2 2.211          
1: Only required for SIWD with automatic dosing of process chemicals - Ref: Table 1 (Footnote No.1)
2: Also referred to as 'Process Residue Test'
 - Ref: Table 1 and Table 3
Back to Testing Categories | Table Key
Free Drainage

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part D
Free Draining: Chamber & Load Carriers 2.85                  
CFPP
01-01
Part D
Free Draining: Tanks 2.86
       
CFPP
01-01
Part D
Free Draining: Flow to Discharge Point 2.87        
CFPP
01-01
Part D
Drainage: Efficacy of Discharge 1 2.88                
CFPP
01-01
Part D
Estimation of Dead Volume of Pipework 2 2.94                  
CFPP
01-01
Part D
Drainage: Drain Seal Integrity 2.75                  
1: Also referred to as 'Purging of the Trap (Type Test Only)' - Ref: 2.88
2: 
Also referred to as 'Drainage: Pipework Residual Volume' - Table 1
Back to Testing Categories | Table Key
Doors, Interlocks
& Fault Indications
Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part D
Doors & Door Interlocks: Cycle Start Interlock 2.132        
CFPP
01-01
Part D
Doors & Door Interlocks: In-Cycle interlock 2.136        
CFPP
01-01
Part D
Doors & Door Interlocks: Double Ended WDs 2.139          
CFPP
01-01
Part D
Doors & Door Interlocks: On Sensor Failure 2.144            
CFPP
01-01
Part D
Doors & Door Interlocks: Fault Indication on Sensor Failure 2.154          
CFPP
01-01
Part D
Doors & Door Interlocks: Failed Cycle interlock 2.151          
CFPP
01-01
Part D
Doors: Opening Force 2.146              
Back to Testing Categories | Table Key
Load Carriers

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference   TT WT  IQ OQ PQ D W Q Y
CFPP
01-01
Part D
Load Carriers  2.183          
Back to Testing Categories | Table Key
Load Dryness

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part D
Load Dryness Test 2.209        
1: Only required if the SIWD has a drying stage - Ref: Table 1 (Footnote No.3)
Back to Testing Categories | Table Key
Thermometric Tests

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part D
Chamber Wall
Temperature
 1 2
2.187        
CFPP
01-01
Part D
Load Carrier
Temperature
 1 2
2.193        
CFPP
01-01
Part D
Over-Temperature Cut-Out 1 2.202        
CFPP
01-01
Part D
Thermometric Test for Disinfection 1 2.292      
1: Thermometric testing is only required if the SIWD has a thermal disinfection stage - Ref: Table 1 (Footnote No.2)
2: These tests may be performed at the same time - Ref: Section 2.200
Back to Testing Categories | Table Key
Venting & Process Emissions Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part D
Venting System: Load Contamination from Ductwork 2.106                
CFPP
01-01
Part D
Water Vapour Emissions 1 2.173                
CFPP
01-01
Part D
Venting System: Steam venting 2.102                
1: Also referred to as 'Water Vapour Discharge Test' - Table 1 and Table 3
Back to Testing Categories | Table Key
Water Quality & Supply

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part D
Water System: Appearance 3.94            
CFPP
01-01
Part D
pH 1 3.100          
CFPP
01-01
Part D
Electrical Conductivity 1  2 3.106        
CFPP
01-01
Part D
Hardness 1  3 3.135        
CFPP
01-01
Part D
Total Viable Count 1 3.219          
CFPP
01-01
Part D
Water Supply Temperature  3.82              
CFPP
01-01
Part D
Water Supply Pressure 3.88              
CFPP
01-01
Part D
Volume of Water Used per Stage 3.124            
CFPP
01-01
Part D
Total Dissolved Solids 1 3.118          
CFPP
01-01
Part D
Chloride 1 3.148          
CFPP
01-01
Part D
Heavy Metals 1 3.159          
CFPP
01-01
Part D
Iron 1 3.162          
CFPP
01-01
Part D
Phosphate 1 3.171          
CFPP
01-01
Part D
Silicate 1 3.182          
CFPP
01-01
Part D
Water System: Bacterial Endotoxins 3.194          
CFPP
01-01
Part D
Water System: Overflow Test 2.116            
1: These tests are collectively known as 'Water System: Chemical Purity' Ref - Table 1
2: 
Also referred to as 'Water Conductivity (Final Rinse Stage)' - Table 1 and Table 3
3: Also referred to as 'Water Hardness (All Process Stages)' - Table 1 and Table 3
Back to Testing Categories | Table Key
Air Quality

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part D
Air Quality 2.217          
Back to Testing Categories | Table Key
Electromagnetic Interference

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part D
Electromagnetic Compatibility 2.227                
Back to Testing Categories | Table Key
Sound Pressure

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part D
Sound Pressure Test
2.221                
 Back to Testing Categories | Table Key
Table Key

Validation Test Abbreviations
TT Type Test By the manufacturer during the machine design stage. CFPP 01-01 Ref: 2.9
Part D
WT Works Test By the manufacturer prior to releasing the machine. CFPP 01-01 Ref: 4.24
Part B
IQ Installation Qualification By the manufacturer, contractor or supplier upon delivery. CFPP 01-01 Ref: 4.28
Part B
OQ Operational Qualification By the Competent Person (Decontamination) after IQ. CFPP 01-01 Ref: 4.34
Part B
PQ Performance Qualification By the CP(D) after IQ and OQ. CFPP 01-01 Ref: 4.37
Part B
D Daily Periodic By the User or by delegation to the Operator. CFPP 01-01 Ref: 4.60
Part B
W Weekly Periodic By the User (or Operator) or CP(D). CFPP 01-01 Ref: 4.60
Part B
Q Quarterly Periodic By the CP(D). CFPP 01-01 Ref: 4.60
Part B
Y Yearly Periodic By the CP(D). CFPP 01-01 Ref: 4.60
Part B
Validation Contacts, Personnel & Miscellaneous Abbreviations 
MAN Manufacture The manufacturer of the machine. CFPP 01-01 Ref: 4.20
Part B
SUP Supplier The supplier of the machine.
Often also the manufacturer.
CFPP 01-01 Ref: 4.20
Part B
CON Contractor Hired to perform IQ.
Often also the manufacturer.
CFPP 01-01 Ref: 4.21
Part B
USER User Has final responsibility for machine performance/operation. CFPP 01-01 Ref: 6.54
Part A
CP(D) Competent Person (Decontamination)     A qualified engineer and test person in decontamination. CFPP 01-01 Ref: 4.18
Part B
OPT Optional Test     The standard states that this is an optional test requirement. N/A
Last Viewed Test Table | Back to Testing Categories