This test is performed to demonstrate that the sterilisation cycle is working within validated parameters such as time, temperature and pressure, using the machines own indicated values on the display.
This test should only be undertaken by a competent and trained person.
The test is required to be completed for each cycle type that the steriliser operates.
Document Specific Test Schedule |
Factory Testing |
Installation & Commissioning |
Periodic Testing |
|||||||||||||
Document | Specific Title | Reference | TT | WT | IQ | OQ | PQ | D | W | Q | Y | |||||
HTM 01-05 | Automatic Control Test | 15.4 | ![]() |
![]() |
![]() |
|||||||||||
HTM 2010 Part 3: Validation & Verification |
Automatic Control Test | 12.1 | ![]() |
![]() |
![]() |
![]() |
![]() |
|||||||||
BS EN 13060 TT/WT/IQ BS EN ISO 17665 OQ/PQ/DWQY |
Automatic Control Test |
10.3 (C) BS EN ISO 17665:1 |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |