Endoscope Washer Disinfector: Automatic Control Test

Testing Endoscope Washer Disinfectors

Automatic Control Test

This test is performed to verify that the control instrumentation on the endoscope washer disinfector is working within validated parameters, such as time and temperature, using the machines own indicated measurements on the display.

This test should only be undertaken by a competent and trained person.

Document Specific Test Schedule

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP 01-06 Testing Methods

Automatic Control Test

3.1
   
NI/CFPP/03

Automatic Control Test

3.1
CFPP 01-06 Testing Methods
   
WHTM 01-06 Testing Methods

Automatic Control Test
Test Method described but no schedule of test

3.1                  
HTM 2030
Validation & Verification

Automatic Control Test

12.4    
SHTM 2030
Validation & Verification

Automatic Control Test

11.1    
BS EN ISO 15883
Part 1

Automatic Control Test
Test Method described but no schedule of test

6.13              
BS EN ISO 15883
Part 4

Not referenced or scheduled within this document