Clinical Large Porous Load Steam Steriliser: Chamber Wall Temperature Test

Testing Clinical Large Porous Load Steam Sterilisers

Chamber Wall Temperature Test

The test is performed to ensure that specific conditions in certain areas of the chamber, in this instance the chamber walls, are being met during the cycle and that the measured temperatures are within tolerance of each other.

This test should only be undertaken by a competent and trained person.

Document Specific Test Schedule

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part C
Not scheduled or referenced within this document N/A                  
NI/CFPP/02 Not scheduled or referenced within this document N/A                  
HTM 2010
Part 3: Validation & Verification
Chamber Wall Temperature Test 13.3              
SHTM 2010
Part 3: Validation & Verification
Chamber Wall Temperature Test 13.3              
WHTM
01-01
Part C
Not scheduled or referenced within this document N/A                  
BS EN 285
TT/WT/IQ
BS EN ISO 17665
OQ/PQ/DWQY
Not scheduled or referenced within this document N/A