Clinical Large Porous Load Steam Steriliser: Weekly Safety Checks

Testing Clinical Large Porous Load Steam Sterilisers

Weekly Safety Checks

These checks and tasks are performed to ensure that important process and safety features are monitored on a weekly basis.

This should only be undertaken by a competent and trained person.

The routine checks and tasks are based on the manufacturer’s recommendations and should be located in the machine manual. 

Document Specific Test Schedule

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
CFPP
01-01
Part C
Weekly Safety Checks 2.104            
NI/CFPP/02 Weekly Safety Checks 2.104
CFPP 01-01
Part C
           
HTM 2010
Part 3: Validation & Verification
Weekly Safety Checks 5.7               
SHTM 2010
Part 3: Validation & Verification
Weekly Safety Checks 5.7              
WHTM
01-01
Part C
Weekly Safety Checks 2.104              
BS EN 285
TT/WT/IQ
BS EN ISO 17665
OQ/PQ/DWQY
Safety Tests and Checks Clause 11
BS EN 285