NI/CFPP/02: Ultrasonic Bath Test Schedule

NI/CFPP/02: Ultrasonic Bath
Installation, Commissioning and Periodic Test Schedule.

Below is the NI/CFPP/02 installation, commissioning and periodic test schedule for ultrasonic baths.

Manufacturer schedules take precedent over the schedule from NI/CFPP/02. If no information is available from the manufacturer then the schedule below should be followed.

Type Tests and Works Tests are carried out by the Manufacturer.

Installation and commissioning (IQ OQ PQ) is carried out by either the equipment Supplier or a qualified Competent Person (Decontamination).

Periodic testing is carried out routinely by the User (or by delegation to the Operator), and also a qualified Competent Person (Decontamination).

Testing Categories

Tests, References and Schedules

A key to the various abbreviations used can be found at the bottom of this page.

Housekeeping and Safety Checks

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
NI/CFPP/02 Remove & Clean Filters & Strainers Etc. 4.35
CFPP 01-01 Part D
             
NI/CFPP/02 Weekly Safety Checks 2.66
CFPP 01-01 Part D
       
NI/CFPP/02 Yearly Safety Checks 2.68
CFPP 01-01 Part D
               
Back to Testing Categories | Table Key
Cleaning Efficacy

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
NI/CFPP/02 Cleaning Efficacy by Residual Soil 2.268
CFPP 01-01 Part D
           
NI/CFPP/02 Cleaning Efficacy Test: Chamber Walls & Load Carriers 1 2.242
CFPP 01-01 Part D
       
NI/CFPP/02 Cleaning Efficacy Test: Reference Load 1 2.247
CFPP 01-01 Part D
       
1: Cleaning efficacy test on Reference Load is performed directly after a successful cleaning efficacy test on Walls and Load Carriers - Ref: 2.247 (CFPP 01-01 Part D).
 Back to Testing Categories | Table Key
Automatic Control Test
& Verification of Calibration
Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
NI/CFPP/02 Automatic Control Test 1 2.304
CFPP 01-01 Part D
     
NI/CFPP/02 Verification of Calibration 1 2.181
CFPP 01-01 Part D
   
1: These tests can be performed at the same time - Ref: Section 2.182 (CFPP 01-01 Part D).
Back to Testing Categories | Table Key
Chemical Additives,
Reproducibility & Residues
Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
NI/CFPP/02 Chemical Dosing: Reproducibility of Volume Admitted 1 2.159
CFPP 01-01 Part D
       
NI/CFPP/02 Chemical Additive(s): Low Level Detection 2.168
CFPP 01-01 Part D
       
1: Also referred to as 'Chemical: Reproducibility' - Ref: Table 4 (CFPP 01-01 Part D).
Back to Testing Categories | Table Key
Free Drainage

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
NI/CFPP/02 Free Draining: Chamber & Load Carriers 2.85
CFPP 01-01 Part D
                 
NI/CFPP/02 Free Draining: Tanks 2.86
CFPP 01-01 Part D

       
NI/CFPP/02 Free Draining: Flow to Discharge Point 2.87
CFPP 01-01 Part D
       
Back to Testing Categories | Table Key
Doors, Interlocks
& Fault Indications
Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
NI/CFPP/02 Doors & Door Interlocks: Cycle Start Interlock 2.132
CFPP 01-01 Part D
       
NI/CFPP/02 Doors & Door Interlocks: In-Cycle interlock 2.136
CFPP 01-01 Part D
       
NI/CFPP/02 On Sensor Failure
2.144
CFPP 01-01 Part D
         
NI/CFPP/02 Doors: Opening Force 2.146
CFPP 01-01 Part D
           
Back to Testing Categories | Table Key
Ultrasonic Activity Test

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
NI/CFPP/02 Test for Ultrasonic Activity 2.313
CFPP 01-01 Part D
           
Back to Testing Categories | Table Key
Load Carriers

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference   TT WT  IQ OQ PQ D W Q Y
NI/CFPP/02 Load Carriers  2.183
CFPP 01-01 Part D
             
Back to Testing Categories | Table Key
Load Dryness

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
NI/CFPP/02 Load Dryness Test 1 2.209
CFPP 01-01 Part D
       
1: Only required if the process has a drying stage - Ref: 2.209 (CFPP 01-01 Part D).
Back to Testing Categories | Table Key
Thermometric Tests

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
NI/CFPP/02 Over-Temperature Cut-Out 2.202
CFPP 01-01 Part D
       
1: The method of test should be obtained from the manufacturer - Ref: NI/CFPP/02 Page 5.
Back to Testing Categories | Table Key
Water Quality & Supply

Factory
Testing
Installation
& Commissioning
Periodic
Testing
Document Specific Title Reference TT WT IQ OQ PQ D W Q Y
NI/CFPP/02 Water: Hardness 3.134
CFPP 01-01 Part D
 
         
NI/CFPP/02 Water: Overflow test 2.116
CFPP 01-01 Part D
           
NI/CFPP/02 Water: Supply Temperature 3.82
CFPP 01-01 Part D
           
NI/CFPP/02 Volume of Water Used per Stage 2.124
CFPP 01-01 Part D
           
Back to Testing Categories | Table Key
Table Key

Validation Test Abbreviations
TT Type Test By the manufacturer during the machine design stage. CFPP 01-01 Ref: 2.9
Part D
WT Works Test By the manufacturer prior to releasing the machine. CFPP 01-01 Ref: 4.24
Part B
IQ Installation Qualification By the manufacturer, contractor or supplier upon delivery. CFPP 01-01 Ref: 4.28
Part B
OQ Operational Qualification By the Competent Person (Decontamination) after IQ. CFPP 01-01 Ref: 4.34
Part B
PQ Performance Qualification By the CP(D) after IQ and OQ. CFPP 01-01 Ref: 4.37
Part B
D Daily Periodic By the User or by delegation to the Operator. CFPP 01-01 Ref: 4.60
Part B
W Weekly Periodic By the User (or Operator) or CP(D). CFPP 01-01 Ref: 4.60
Part B
Q Quarterly Periodic By the CP(D). CFPP 01-01 Ref: 4.60
Part B
Y Yearly Periodic By the CP(D). CFPP 01-01 Ref: 4.60
Part B
Validation Contacts, Personnel & Miscellaneous Abbreviations 
MAN Manufacture The manufacturer of the machine. CFPP 01-01 Ref: 4.20
Part B
SUP Supplier The supplier of the machine.
Often also the manufacturer.
CFPP 01-01 Ref: 4.20
Part B
CON Contractor Hired to perform IQ.
Often also the manufacturer.
CFPP 01-01 Ref: 4.21
Part B
USER User Has final responsibility for machine performance/operation. CFPP 01-01 Ref: 6.54
Part A
CP(D) Competent Person (Decontamination)     A qualified engineer and test person in decontamination. CFPP 01-01 Ref: 4.18
Part B
OPT Optional Test     The standard states that this is an optional test requirement. N/A
Last Viewed Test Table | Back to Testing Categories